To successfully complete the module calibration, all performance tests must be run and passed within 14 days to run the Store Cal Info to Module test. (Does not apply to the M9378A/B directional coupler modules.) |
The calibration process for the M9485A VNA requires using a known good M9485A VNA with two receiver modules. This known good M9485A VNA will be referred to as the Test System. The M9485A VNA being calibrated will be referred to as the DUT (device under test).
The N7878A calibration application applies to the following modules within the M9485A VNA instrument:
|
Module Number |
Module Name |
Modules per DUT |
|
M9340A |
distributor |
up to 4 per DUT |
|
M9376A |
receiver |
2 to 24 per DUT |
|
M9377A |
direct access receiver |
2 to 12 per DUT for configurable test set or direct access receiver without coupler configuration |
|
M9378A |
directional coupler |
2 to 12 per DUT for configurable test set configuration |
The other modules will be calibrated independently or as part of an instrument (group of modules) using their respective calibration applications (see table below). The receiver/direct access receiver and distributor modules in the Test System will be removed and replaced with the receiver/direct access receiver and distributor modules from the DUT. They will be calibrated individually while in the Test System and then returned to the DUT.
The directional coupler modules are passive devices which can be calibrated independently without the Test System. It is recommended to place the directional coupler modules from the DUT in the chassis (not necessarily in the Test System) during calibration. They will be calibrated individually and then returned to the DUT. Then, the other modules in the M9485A VNA will be calibrated with their respective applications as explained in next section
|
Number |
Name |
Calibration Application |
|
M9389A |
PXIe VNA source instrument Contains the following modules:
|
N7870A
|
|
M9300A |
PXIe frequency reference module |
N7873A |
|
M9309A |
PXIe VNA synthesizer module1 |
N7877A |
|
M9340A |
PXIe VNA distributor module |
N7878A |
|
M9376A |
PXIe VNA receiver module |
N7878A |
|
M9377A |
PXIe VNA direct access receiver module2 |
N7878A |
|
M9378A |
PXIe VNA directional coupler module3 |
N7878A |
|
M9378B |
PXIe VNA directional coupler with bias tee module4 |
N7878A |
|
There is a specific sequence of steps to do the entire calibration procedure. These steps must be followed to ensure a successful calibration.
Obtain a known, good M9485A VNA with 2 receiver modules. This will be used as the Test System. Install the modules in the chassis in the slots as shown below. This configuration is required by firmware and rigid cable setup.
|
Slot |
Module |
|
1 |
PXI or embedded controller |
|
2 |
M9310A source output |
|
3 |
M9309A synthesizer (this synthesizer is a component of the M9389A VNA Source) |
|
4 |
M9300A reference |
|
5 |
M9309A synthesizer (this synthesizer is a component of the M9485A VNA) |
|
6 |
M9340A distributor |
|
7 |
M9376A receiver or M9377A direct access receiver |
|
8 |
M9376A receiver |
Remove cabling and dividers to remove one receiver module from the DUT.
On the Test System, disassemble the cabling and dividers, remove the existing receiver/direct access receiver module from Slot 7, and insert the receiver module from the DUT into Slot 7 of the Test System (Slot 7 required by firmware/cabling).
Reconnect the cables and dividers on the Test System.
Restart the PC and the Test System.
Open the M9485A soft front panel and update the FPGA of the receiver module under test.
Restart the PC and the Test System.
Open the M9485A soft front panel.
Open TME and create an order for the M9376A receiver module.
Run a Power Correction Calibration from the soft front panel. Performance verification results are invalid unless this calibration is performed prior to running any tests.
Run all of the Performance Verification tests for the M9376A receiver module. Refer to the Performance Tests Overview for a list of tests.
Repeat steps 2 to 11 for each receiver module in the DUT.
(Skip these steps if the DUT does not have any M9377A modules.)
Remove cabling and dividers to remove one direct access receiver module from the DUT system.
On the Test System, disassemble the cabling and dividers, remove the existing receiver/direct access receiver module from Slot 7, and insert the direct access receiver module from the DUT into Slot 7 of the Test System (Slot 7 required by firmware/cabling).
Reconnect the cables and dividers on the Test System.
Restart the PC and the Test System.
Open the M9485A soft front panel and update the FPGA of the direct access receiver module under test.
Restart the PC and the Test System.
Open the M9485A soft front panel.
Open TME and create an order for the M9377A direct access receiver module.
Run a Power Correction Calibration from the soft front panel. Performance verification results are invalid unless this calibration is performed prior to running any tests.
Run all of the Performance Verification tests for the M9377A direct access receiver module. Refer to the Performance Tests Overview for a list of tests.
Repeat steps 13 to 22 for each direct access receiver module in the DUT.
(Skip these steps if the DUT does not have any M9378A/B modules.)
Remove cabling and dividers for one directional coupler module in the DUT. It is not necessary to remove the directional coupler module from the DUT and insert it into the Test System, but it is recommended to place the directional coupler module in a chassis during calibration. It is not required to open the M9485A soft front panel when testing the directional coupler module.
Open TME and create an order for the M9378A or M9378B directional coupler module.
Run all of the Performance Verification tests for the M9378A/B direct access receiver module. Refer to the Performance Tests Overview for a list of tests.
Repeat steps 24 to 26 for each directional coupler module in the DUT.
Insert the Test System's M9376A receiver/M9377A direct access receiver module back into Slot 7 and remove the M9340A distributor module from Slot 6 of the Test System.
Remove a M9340A distributor module from the DUT.
Insert the DUT distributor module into the Test System and reconnect all necessary cabling.
Restart the PC and Test System.
Open the M9485A soft front panel and update the FPGA of the distributor module under test.
Restart the PC and the Test System.
Open the M9485A soft front panel.
Open TME and create an order for the M9340A distributor module.
Run the Performance Verification test for the M9340A distributor module: Frequency Response Gain and Output Power.
Repeat steps 29 to 36 for each distributor module in the DUT.
Reassemble and connect the DUT system to the PC with TME. Reboot both the PC and the DUT.
|
|
The TME calibration applications used in the following steps are packaged with the N7878A application and are also available at the Keysight Technologies TME N7800A Calibration website: http://cal.software.keysight.com |
Open the N7873A PXI Frequency Reference Calibration Application and execute the performance verification tests for the M9300A reference module on the DUT.
Open the N7877A PXI Modular Synthesizer Calibration Application and execute the performance verification tests for the M9309A synthesizer module that is part of the DUT. (The M9309A synthesizer that is next to the M9310A source output module will be calibrated in Step 41 as part of the M9489A VNA Source.)
Open the N7870A PXI Vector Signal Generator Calibration Application and execute the performance verification for the M9389A VNA Source instrument on the DUT.