Detailed Calibration Procedure

To successfully complete the module calibration, all performance tests must be run and passed within 14 days to run the Store Cal Info to Module test. (Does not apply to the M9378A/B directional coupler modules.)

Overview

The calibration process for the M9485A VNA requires using a known good M9485A VNA with two receiver modules. This known good M9485A VNA will be referred to as the Test System. The M9485A VNA being calibrated will be referred to as the DUT (device under test).

The N7878A calibration application applies to the following modules within the M9485A VNA instrument:

Module Number

Module Name

Modules per DUT

M9340A

distributor

up to 4 per DUT

M9376A

receiver

2 to 24 per DUT

M9377A

direct access receiver

2 to 12 per DUT for configurable test set or direct access receiver without coupler configuration

M9378A
M9378B

directional coupler

2 to 12 per DUT for configurable test set configuration

 

The other modules will be calibrated independently or as part of an instrument (group of modules) using their respective calibration applications (see table below). The receiver/direct access receiver and distributor modules in the Test System will be removed and replaced with the receiver/direct access receiver and distributor modules from the DUT. They will be calibrated individually while in the Test System and then returned to the DUT.

The directional coupler modules are passive devices which can be calibrated independently without the Test System. It is recommended to place the directional coupler modules from the DUT in the chassis (not necessarily in the Test System) during calibration. They will be calibrated individually and then returned to the DUT. Then, the other modules in the M9485A VNA will be calibrated with their respective applications as explained in next section

Modules/Instruments within the M9485A VNA and their calibration applications

Number

Name

Calibration Application

M9389A

PXIe VNA source instrument

Contains the following modules:

  • M9310A source output module
  • M9309A synthesizer module1

N7870A

 

M9300A

PXIe frequency reference module

N7873A

M9309A

PXIe VNA synthesizer module1

N7877A

M9340A

PXIe VNA distributor module

N7878A

M9376A

PXIe VNA receiver module

N7878A

M9377A

PXIe VNA direct access receiver module2

N7878A

M9378A

PXIe VNA directional coupler module3

N7878A

M9378B

PXIe VNA directional coupler with bias tee module4

N7878A

  1. There are two M9309A synthesizer modules in the M9485A VNA configuration. They are not identical. The first synthesizer module is calibrated as part of the M9389A VNA source instrument. The second M9309A synthesizer module is calibrated separately with the N7877A calibration application.

  2. The M9377A VNA direct access receiver is only available in the M9485A VNA with configurable test set or direct access receiver without coupler configuration.

  3. The M9378A VNA directional coupler is only available in the M9485A VNA with configurable test set configuration.

  4. The M9378B VNA directional coupler with bias tee is only available in the M9485A VNA with configurable test set with bias tee configuration.

Detailed Calibration Procedure

There is a specific sequence of steps to do the entire calibration procedure. These steps must be followed to ensure a successful calibration.

Prepare the Test System

  1. Obtain a known, good M9485A VNA with 2 receiver modules. This will be used as the Test System. Install the modules in the chassis in the slots as shown below. This configuration is required by firmware and rigid cable setup.

    Slot

    Module

    1

    PXI or embedded controller

    2

    M9310A source output

    3

    M9309A synthesizer (this synthesizer is a component of the M9389A VNA Source)

    4

    M9300A reference

    5

    M9309A synthesizer (this synthesizer is a component of the M9485A VNA)

    6

    M9340A distributor

    7

    M9376A receiver or M9377A direct access receiver

    8

    M9376A receiver

Calibrate the M9376A receiver modules

  1. Remove cabling and dividers to remove one receiver module from the DUT.

  2. On the Test System, disassemble the cabling and dividers, remove the existing receiver/direct access receiver module from Slot 7, and insert the receiver module from the DUT into Slot 7 of the Test System (Slot 7 required by firmware/cabling).

  3. Reconnect the cables and dividers on the Test System.

  4. Restart the PC and the Test System.

  5. Open the M9485A soft front panel and update the FPGA of the receiver module under test.

  6. Restart the PC and the Test System.

  7. Open the M9485A soft front panel.

  8. Open TME and create an order for the M9376A receiver module.

  9. Run a Power Correction Calibration from the soft front panel. Performance verification results are invalid unless this calibration is performed prior to running any tests.

  10. Run all of the Performance Verification tests for the M9376A receiver module. Refer to the Performance Tests Overview for a list of tests.

  11. Repeat steps 2 to 11 for each receiver module in the DUT.

Calibrate the M9377A direct access receiver modules

(Skip these steps if the DUT does not have any M9377A modules.)

  1. Remove cabling and dividers to remove one direct access receiver module from the DUT system.

  2. On the Test System, disassemble the cabling and dividers, remove the existing receiver/direct access receiver module from Slot 7, and insert the direct access receiver module from the DUT into Slot 7 of the Test System (Slot 7 required by firmware/cabling).

  3. Reconnect the cables and dividers on the Test System.

  4. Restart the PC and the Test System.

  5. Open the M9485A soft front panel and update the FPGA of the direct access receiver module under test.

  6. Restart the PC and the Test System.

  7. Open the M9485A soft front panel.

  8. Open TME and create an order for the M9377A direct access receiver module.

  9. Run a Power Correction Calibration from the soft front panel. Performance verification results are invalid unless this calibration is performed prior to running any tests.

  10. Run all of the Performance Verification tests for the M9377A direct access receiver module. Refer to the Performance Tests Overview for a list of tests.

  11. Repeat steps 13 to 22 for each direct access receiver module in the DUT.

Calibrate the M9378A/B directional coupler modules

(Skip these steps if the DUT does not have any M9378A/B modules.)

  1. Remove cabling and dividers for one directional coupler module in the DUT. It is not necessary to remove the directional coupler module from the DUT and insert it into the Test System, but it is recommended to place the directional coupler module in a chassis during calibration. It is not required to open the M9485A soft front panel when testing the directional coupler module.

  2. Open TME and create an order for the M9378A or M9378B directional coupler module.

  3. Run all of the Performance Verification tests for the M9378A/B direct access receiver module. Refer to the Performance Tests Overview for a list of tests.

  4. Repeat steps 24 to 26 for each directional coupler module in the DUT.

Calibrate the M9340A distributor module(s)

  1. Insert the Test System's M9376A receiver/M9377A direct access receiver module back into Slot 7 and remove the M9340A distributor module from Slot 6 of the Test System.

  2. Remove a M9340A distributor module from the DUT.

  3. Insert the DUT distributor module into the Test System and reconnect all necessary cabling.

  4. Restart the PC and Test System.

  5. Open the M9485A soft front panel and update the FPGA of the distributor module under test.

  6. Restart the PC and the Test System.

  7. Open the M9485A soft front panel.

  8. Open TME and create an order for the M9340A distributor module.

  9. Run the Performance Verification test for the M9340A distributor module: Frequency Response Gain and Output Power.

  10. Repeat steps 29 to 36 for each distributor module in the DUT.

  11. Reassemble and connect the DUT system to the PC with TME. Reboot both the PC and the DUT.

Calibrate the remaining modules in the DUT

The TME calibration applications used in the following steps are packaged with the N7878A application and are also available at the Keysight Technologies TME N7800A Calibration website: http://cal.software.keysight.com

  1. Open the N7873A PXI Frequency Reference Calibration Application and execute the performance verification tests for the M9300A reference module on the DUT.

  2. Open the N7877A PXI Modular Synthesizer Calibration Application and execute the performance verification tests for the M9309A synthesizer module that is part of the DUT. (The M9309A synthesizer that is next to the M9310A source output module will be calibrated in Step 41 as part of the M9489A VNA Source.)

  3. Open the N7870A PXI Vector Signal Generator Calibration Application and execute the performance verification for the M9389A VNA Source instrument on the DUT.